The Process



The Shower Remodel Process
The Short Version
From first conversation to finished shower.
Plan your design. We’ll talk through the details together, with no formal drawing needed. You’ll choose your tile, edge finish, niche or shelves, plumbing fixtures, and metal finish color.
Select your finishes. You’ll choose your tile, fixtures, and shower door from local suppliers, and I’ll provide a list of places to shop.
Construction. Your plumber and glass installer remove the old fixtures and door, then we demolish and haul away your old shower. Next comes rough plumbing, tile installation, and finish plumbing. Your custom glass door is installed last, since it takes time to fabricate.
Every shower is different. Depending on your project, you may need a new mixing valve, added lighting, or drywall repair after demolition.




The Long Version
A clear, step-by-step path from first conversation to finished shower.
Preconstruction Process for Bathroom Remodels
Plan it right before demo begins.
The best remodels are decided on paper, not on the job site. Before any construction begins, we work through a preconstruction phase together, so you know exactly what you’re getting and what it will cost.
Ready to get started? Call or text Ryan at (414) 405-2533 or email ryan@smooth-surface.net to talk through your project.

Remodeling Process for Bathroom Remodels
Plan it right before we build.
Every remodel starts with a design phase, so you know exactly what you’ll get and what it will cost before construction begins.
- Share your goals. Tell us your vision and your budget. Because I build on a cost-plus contract, you pay the actual cost of labor and materials, with no padding to stretch your budget.
- Design. We draft your bathroom and help you choose the finishes.
- Review. Approve your drawings and selections, with up to two small revisions included. Changes can always be made later.
- Estimate. After your finishes are chosen work starts on the estimate.
- Make your decision. Choose whether to build with us. No obligation.
- Get the permits. We apply for them before construction begins.
- Construction begins. Your new bathroom takes shape.
- Finish. New Bathrooms typically take at least a few months to complete. The larger the size and the more intricate the details are the longer it will take.